We have developed numerous projects and installations over the years, both our own and for other clients, as well as collaborations of the Valsolar group with other companies of great prestige in the sector, which have been the impetus for projects of great interest in our region.
Facilities
When everybody started to talk about “solar panels”, but this idea had not yet materialized, Valsolar 2006 S.L. started the construction of the first photovoltaic plant in the world. THE FIRST PHOTOVOLTAIC PLANT in Extremadura, in the town of Valencia del Mombuey, with a power of 0.6MW.
We have collaborated with numerous companies.
Technical work for the assembly of the thermosolar plant in Olivenza (50 MW).
Repair of Logrosán (Mojón Gordo Plant).- Cavalum: we have had joint installations (Talarrubias, Fuente de Cantos, Albuera, Vega de Botoa).
we have had joint installations (Talarrubias, Fuente de Cantos, Albuera, Vega de Botoa).
With the 400 MW Calzadilla project - School of Industrial Engineering: Follower of the EII and various collaborative research projects over the years.- Agreements with UEX and Instituto Cuatro Caminos de Don Benito to host internship students.
Agreements with UEX and Instituto Cuatro Caminos de Don Benito to host internship students.
Follower of IBD and various collaborative research projects over the years.
Valdelacalzada Energy Community.
Doctor en Ingeniería Industrial por la Universidad de Extremadura

Doctor en Ciencias Económicas por la Universidad de Extremadura

Ingeniero Técnico Industrial, especialidad en Electricidad, por la Universidad de Extremadura.

In Valsolar we believe that communication is a fundamental pillar to develop any proposed project. Contact with us.
El Nevero Industrial Park
C/Nevero 18 – 19 Vial Interior
6006 Badajoz
+34 924 27 87 00
valsolar@valsolar.com